When

Tuesday, January 28, 2020 from 11:30 AM to 1:00 PM CST
Add to Calendar 

Where

Cinzetti's 
7201 W. 91st Street
Overland Park, KS 66212
 

 
Driving Directions 

Contact

Morgan Race 
ASCE/MSPE 
 
ascekc@kcengineers.org 
 

ASCE/MSPE January 2020 Luncheon 

 

TOPIC:               I-435 South Loop Link Design Build

SPEAKER:         Ryan Kneib and Jared Yost

DATE:                 Tuesday, January 28th, 2020

TIME:                   11:30 a.m. Social 
                            12:00 p.m. Lunch and Presentation

 LOCATION:         Cinzetti's – 7201 W. 91st Street, Overland Park, KS 66212

COST:                 $20.00 for Regular Attendees, $10.00 for Student Attendees.  Please make checks payable to ASCE. 

PRESENTATION DETAILS:            We will discuss the I-435 South Loop Link Design Build project regarding construction phasing, materials, and innovative practices implemented on the project.

BIO:             Ryan Kneib graduated Ryan with a Bachelor’s Degree in Civil Engineering from the Missouri University of Science and Technology in May of 2015.  He has worked for the Missouri Department of Transportation (MoDOT) since graduation.  Projects include: Lead Inspector on Pavement Replacement, ADA, and Utility Updates on Mechanic Street in Harrisonville, MO the summer of 2016;  Lead Inspector on the I-470 Multi-Bridge Rehabilitation Project between the Three Trails Crossing and I-70 from summer 2017 through winter 2018; and I-435 South Loop Link Design Build Team Member from summer of 2019 to present day.

Jared graduated from Kansas State University in May 2016 with a Bachelor’s Degree in Civil Engineering.  He has worked for the Missouri Department of Transportation (MoDOT) as a Construction Inspector since graduation. Projects include: Inspector on the reconfiguration of the I-35 Pleasant Valley Interchange during 2016-2017; Lead Inspector for pavement replacement, ADA improvements, and guardrail replacement on Route 152 in 2017; Lead Inspector for the replacement of the Clay County Route DD Bridge in Smithville, MO in 2018; and I-435 South Loop Link Design Build Team Member from summer of 2019 to present day.