Groundwater infiltration continues to attack the integrity of our sewer systems, responsible for SSO’s, overloading our treatment plants and costs to tax payers. When not resolved, the cost to restore can increases exponentially.
Join us at our Municipal Sewer Grout School to learn why & how injection grout is used to stop groundwater infiltration into sewer collection systems, stabilize pipe beddings, saving taxpayers money and ultimately, extending the system's useful life.
Day 1
Time |
Item |
Location |
7:30 - 8:00 |
Registration Coffee + Donuts |
Classroom |
8:00 - 8:30 |
Welcome: How to get the most of the |
Classroom |
8:30 - 9:45 |
Introduction to Municipal Grouting & remotely operated equipment |
Classroom |
9:45 - 10:15 |
Grout Truck Introduction |
Classroom |
10:15 - 10:30 |
BREAK |
|
10:30 - 10:45 |
Infiltration flow rate demo in sewer pipe bedding soils |
Outside |
10:30 - 11:00 |
Grout Truck & CCTV/Packer installation above ground |
Outside |
11:00 - 12:00 |
Introduction to NEW NASSCO/ICGC specifications & quick intro on test cell white Paper |
Classroom |
12:00 - 12:30 |
LUNCH |
|
12:30 - 1:10 |
Pressure Transducer + Grout Panel |
Classroom |
1:10 – 1:25 |
Hydraulic water pressure & transducer example (mainline plexiglass) |
Outside |
1:25 - 3:00
4 groups – 25 min each |
|
Outside |
3:00 - 3:15 |
BREAK |
|
3:15 - 4:15 |
Grout truck system with water
|
Outside |
4:15 - 5:00 |
|
Outside |
5:00 - 5:30 |
Recap of day, Q&A |
Classroom |
5:30-6:30 |
NETWORKING HAPPY HOUR |
|
Day 2
Time |
Item |
Location |
7:30-8:00 |
Arrival + Breakfast |
|
8:00-9:15 |
SOPP Certification - Grouting material safety training course & test |
Classroom |
9:15-9:30 |
BREAK + Class Photo |
|
9:30-10:15 |
Grout Tank Mixing |
Outside |
10:15-11:00 |
Logiball Packer Presentation & Maintenance |
Classroom |
11:00-11:30 |
Temperature effects on gel time |
outside |
11:30-12:30 |
Manhole Rehab Presentation & Demo |
Outside |
12:30-1:00 |
LUNCH |
|
1:00 – 1:30 |
Sand Grout Box & Mainline Packer |
Outside |
1:30 – 2:00 |
Annulus Grouting of Lined Pipe |
Outside |
2:00 – 2:30 |
Lateral Connection Sealing Demo |
Outside |
2:30 - 2:45 |
BREAK |
|
2:45 – 3:15 |
Open discussion |
Classroom
|
3:15-3:30 |
Complete evaluation form |
|
3:30-4:00 |
Issue Certificate of Completion SOPP Certificates by email |
|
4:00 |
End of school – safe travels! |
|