New CSI Logo

Contact

Edmund L. Brown, CSI, CCCA, Assoc. AIA

CSI Chapter President

ed@sebreearchitects.com

317.272.7800

When

Thursday January 16, 2014 from 5:30 PM to 8:30 PM EST

Add to Calendar 

Where

The Marten House Hotel and Lilly Conference Center 
1801 W. 86th St.
Indianapolis, IN 46260
 

 
Driving Directions 
 

Indianapolis Chapter CSI January Meeting:  

The Deep Rock Tunnel Project

The Deep Rock Tunnel Connector Project is under construction. Tim Shutters with Citizens Energy Group is the Construction Manager, and is responsible for the day to day operations on the job. Tim will be providing and update to the group that will cover some the different methods utilized to construct the many shafts and approach structures that are being installed, along with the very interesting tunnel itself. Some of the methods covered are TBM Mining, Slurry Wall Construction, Raise Bore Method of shaft installation, Rock support in the tunnel and Launch and Retrieval Shaft Construction.

 

 Speaker: Tim Shutters, Construction Supervisor for Citizens Energy Group

 Tim has been in heavy construction for nearly 24 years. He has a wide array of experience including site, roadway, bridge, storm, sanitary, microtunneling, and deep rock tunneling. Tim is a new employee at Citizens Energy Group, but has worked locally his entire career.