TSPE Logo

Contact

TSPE Dallas Chapter 
 
rsvp@dallastspe.com 
 

When

Thursday June 12, 2014 from 12:00 PM to 1:00 PM CDT

Add to Calendar 

Where

Maggiano's Little Italy Northpark Center 
8687 N Central Expressway
(Upstairs Ballroom)
(Northwest Hwy & Central Expressway)
Dallas, TX 75225
 

 
Driving Directions 
 

June TSPE Dallas Chapter Meeting

11:30 - 12:00 pm Registration and Networking
12:00 - 1:00 pm Lunch / Speakers

 

"Mill Creek/Peaks Branch/State Thomas Drainage Relief Tunnel"

 

 

Todd Woodson, P.E.

Project Manager

Halff Associates, Inc.

 

Drainage relief for the Mill Creek / Peaks Branch / State Thomas areas will be accomplished through the design and construction of a single 30-foot diameter, 27,000-foot long drainage relief tunnel.  The deep tunnel will provide drainage relief to these frequently flooded areas of Dallas.   The tunnel will be mined in the Austin Chalk formation between 70 and 150 feet below the surface and will outfall to White Rock Creek. 

About the Speaker:

Todd Woodson served as the project manager for Mill Creek & Peaks Branch Tunnel in Dallas.  Todd has 18 years of experience in design, management, and construction of heavy-civil projects.  His design expertise includes airfield, military construction, land development, transportation and drainage-relief projects.  He has managed such projects as the DFW International Airport, Terminal D, Perimeter Apron Paving Project; the Kilby Center East at Texas Instruments North Central Expressway location in Dallas and various assignments for USACE and AAFES at Fort Bliss, Texas, Fort Polk, Louisiana, Redstone Arsenal in Alabama and Shaw Air Force Base in South Carolina.  Todd received his bachelor of science in civil engineering from Texas A&M University.